{"id":27030,"date":"2026-07-02T21:31:18","date_gmt":"2026-07-03T01:31:18","guid":{"rendered":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/"},"modified":"2026-07-02T21:31:18","modified_gmt":"2026-07-03T01:31:18","slug":"ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida","status":"publish","type":"post","link":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/","title":{"rendered":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda"},"content":{"rendered":"<\/p>\n<p>\n                    <img decoding=\"async\" src=\"https:\/\/cdn.jsdelivr.net\/gh\/sergiosdlima\/assets-ebc@1.0.0\/abr\/assets\/images\/logo-agenciabrasil.svg\" alt=\"Logo Ag\u00eancia Brasil\"><\/p>\n<p><strong>A constru\u00e7\u00e3o da primeira fase da ferrovia Transnordestina, no ramal que conecta o interior do Piau\u00ed ao litoral do Cear\u00e1, atingiu 82% de obras f\u00edsicas conclu\u00eddas. <\/strong><img decoding=\"async\" src=\"https:\/\/agenciabrasil.ebc.com.br\/ebc.png?id=1695765&#038;o=rss\"><img decoding=\"async\" src=\"https:\/\/agenciabrasil.ebc.com.br\/ebc.gif?id=1695765&#038;o=rss\"><\/p>\n<p><strong>O trecho mais recente, de pouco mais de 100 quil\u00f4metros (km), entre as cidades cearenses de Acopiara e Quixeramobim, foi inaugurado nesta quinta-feira (2), em um evento que contou com a presen\u00e7a do presidente Luiz In\u00e1cio Lula da Silva e do governador Elmano de Freitas.\u00a0\u00a0<\/strong><\/p>\n<blockquote>\n<h3>Not\u00edcias relacionadas:<\/h3>\n<ul>\n<li>Governo vai defender retomada de obras da Transnordestina junto ao TCU.<\/li>\n<\/ul>\n<p>&#8220;Essa \u00e9 uma estrada de ferro vital para a perspectiva de desenvolvimento dessa regi\u00e3o&#8221;, afirmou Lula na cerim\u00f4nia em Quixeramobim.\n<\/p><\/blockquote>\n<p>Considerada a maior obra de infraestrutura linear em execu\u00e7\u00e3o no pa\u00eds, a Transnordestina ter\u00e1 1.206 quil\u00f4metros de extens\u00e3o, ligando Eliseu Martins (PI) ao Porto do Pec\u00e9m (CE), e atravessar\u00e1 53 munic\u00edpios nordestinos, incluindo o oeste de Pernambuco, pela cidade de Salgueiro.<\/p>\n<p><strong>Com a entrega dos novos trechos, a ferrovia passa a contar com 777 quil\u00f4metros de infraestrutura f\u00edsica finalizada, de acordo com o Minist\u00e9rio dos Transportes. A previs\u00e3o \u00e9 que o total de 1,2 mil km de trilhos esteja conclu\u00eddo at\u00e9 o fim do ano que vem.<\/strong><\/p>\n<p>Segundo o governo federal, o investimento total na obra est\u00e1 estimado em R$ 15 bilh\u00f5es, com R$ 9,8 bilh\u00f5es desembolsados at\u00e9 mar\u00e7o de 2026.<\/p>\n<p>A agenda desta quinta tamb\u00e9m marcou a entrega de 100 vag\u00f5es graneleiros destinados ao transporte de gr\u00e3os e fertilizantes e o an\u00fancio da produ\u00e7\u00e3o de outros 370 vag\u00f5es. Al\u00e9m disso, foi assinada a ordem de servi\u00e7o do Ramal Nelog, que far\u00e1 a liga\u00e7\u00e3o da ferrovia ao Terminal de Uso Privado (TUP) Nelog, no Complexo do Pec\u00e9m, e a assinatura de protocolo de inten\u00e7\u00f5es para implanta\u00e7\u00e3o do Porto Seco de Quixeramobim, empreendimento com previs\u00e3o de R$ 1 bilh\u00e3o em investimentos privados para melhorar a log\u00edstica regional e estimular a instala\u00e7\u00e3o de novos empreendimentos industriais.<\/p>\n<h2>Liga\u00e7\u00e3o com Porto de Suape<\/h2>\n<p>Originalmente, o projeto da ferrovia Transnordestina, iniciado h\u00e1 20 anos, previa um ramal de mais 500 km ligando o oeste de Pernambuco, a partir de Salgueiro, ao Porto de Suape, na regi\u00e3o metropolitana do Recife, mas o trecho foi retirado na gest\u00e3o anterior.\u00a0A contrata\u00e7\u00e3o permanece suspensa por decis\u00e3o do Tribunal de Contas da Uni\u00e3o (TCU).<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A constru\u00e7\u00e3o da primeira fase da ferrovia Transnordestina, no ramal que conecta o interior do Piau\u00ed ao litoral do Cear\u00e1, atingiu 82% de obras f\u00edsicas conclu\u00eddas. O trecho mais recente, de pouco mais de 100 quil\u00f4metros (km), entre as cidades cearenses de Acopiara e Quixeramobim, foi inaugurado nesta quinta-feira (2), em um evento que contou [&hellip;]<\/p>\n","protected":false},"author":326,"featured_media":27031,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rop_custom_images_group":[],"rop_custom_messages_group":[],"rop_publish_now":"initial","rop_publish_now_accounts":{"facebook_9136735276363284_1546287478841159":""},"rop_publish_now_history":[],"rop_publish_now_status":"pending","_jetpack_newsletter_access":"","_jetpack_dont_email_post_to_subs":false,"_jetpack_newsletter_tier_id":0,"_jetpack_memberships_contains_paywalled_content":false,"_jetpack_feature_clip_id":0,"_jetpack_memberships_contains_paid_content":false,"footnotes":"","jetpack_post_was_ever_published":false},"categories":[37],"tags":[],"class_list":["post-27030","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-economia-e-negocios"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.4 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/\" \/>\n<meta property=\"og:locale\" content=\"pt_BR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda -\" \/>\n<meta property=\"og:description\" content=\"A constru\u00e7\u00e3o da primeira fase da ferrovia Transnordestina, no ramal que conecta o interior do Piau\u00ed ao litoral do Cear\u00e1, atingiu 82% de obras f\u00edsicas conclu\u00eddas. O trecho mais recente, de pouco mais de 100 quil\u00f4metros (km), entre as cidades cearenses de Acopiara e Quixeramobim, foi inaugurado nesta quinta-feira (2), em um evento que contou [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/\" \/>\n<meta property=\"article:published_time\" content=\"2026-07-03T01:31:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn.jsdelivr.net\/gh\/sergiosdlima\/assets-ebc@1.0.0\/abr\/assets\/images\/logo-agenciabrasil.svg\" \/>\n<meta name=\"author\" content=\"Pedro Rafael Vilela - Reporter da Agencia Brasil\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Escrito por\" \/>\n\t<meta name=\"twitter:data1\" content=\"Pedro Rafael Vilela - Reporter da Agencia Brasil\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. tempo de leitura\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutos\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/\"},\"author\":{\"name\":\"Pedro Rafael Vilela - Reporter da Agencia Brasil\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/#\\\/schema\\\/person\\\/c318ac91032ff641c8e428b21a068745\"},\"headline\":\"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda\",\"datePublished\":\"2026-07-03T01:31:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/\"},\"wordCount\":408,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zerohorabrasil.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg\",\"articleSection\":[\"Economia e Neg\u00f3cios\"],\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/\",\"url\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/\",\"name\":\"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/zerohorabrasil.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg\",\"datePublished\":\"2026-07-03T01:31:18+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/#\\\/schema\\\/person\\\/c318ac91032ff641c8e428b21a068745\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#breadcrumb\"},\"inLanguage\":\"pt-BR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#primaryimage\",\"url\":\"https:\\\/\\\/zerohorabrasil.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg\",\"contentUrl\":\"https:\\\/\\\/zerohorabrasil.com\\\/wp-content\\\/uploads\\\/2026\\\/07\\\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg\",\"width\":1600,\"height\":800,\"caption\":\"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/ultimas-noticias\\\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"In\u00edcio\",\"item\":\"https:\\\/\\\/zerohorabrasil.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/#website\",\"url\":\"https:\\\/\\\/zerohorabrasil.com\\\/\",\"name\":\"\",\"description\":\"Zh Brasil\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/zerohorabrasil.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"pt-BR\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/zerohorabrasil.com\\\/#\\\/schema\\\/person\\\/c318ac91032ff641c8e428b21a068745\",\"name\":\"Pedro Rafael Vilela - Reporter da Agencia Brasil\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"pt-BR\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/45d311b6c169fdb85f7677d430aba5f5d4d94cec71b6ab993c45397f1be11d65?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/45d311b6c169fdb85f7677d430aba5f5d4d94cec71b6ab993c45397f1be11d65?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/45d311b6c169fdb85f7677d430aba5f5d4d94cec71b6ab993c45397f1be11d65?s=96&d=mm&r=g\",\"caption\":\"Pedro Rafael Vilela - Reporter da Agencia Brasil\"},\"url\":\"https:\\\/\\\/zerohorabrasil.com\\\/author\\\/pedro-rafael-vilela-reporter-da-agencia-brasil\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/","og_locale":"pt_BR","og_type":"article","og_title":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda -","og_description":"A constru\u00e7\u00e3o da primeira fase da ferrovia Transnordestina, no ramal que conecta o interior do Piau\u00ed ao litoral do Cear\u00e1, atingiu 82% de obras f\u00edsicas conclu\u00eddas. O trecho mais recente, de pouco mais de 100 quil\u00f4metros (km), entre as cidades cearenses de Acopiara e Quixeramobim, foi inaugurado nesta quinta-feira (2), em um evento que contou [&hellip;]","og_url":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/","article_published_time":"2026-07-03T01:31:18+00:00","og_image":[{"url":"https:\/\/cdn.jsdelivr.net\/gh\/sergiosdlima\/assets-ebc@1.0.0\/abr\/assets\/images\/logo-agenciabrasil.svg","type":"","width":"","height":""}],"author":"Pedro Rafael Vilela - Reporter da Agencia Brasil","twitter_card":"summary_large_image","twitter_misc":{"Escrito por":"Pedro Rafael Vilela - Reporter da Agencia Brasil","Est. tempo de leitura":"2 minutos"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#article","isPartOf":{"@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/"},"author":{"name":"Pedro Rafael Vilela - Reporter da Agencia Brasil","@id":"https:\/\/zerohorabrasil.com\/#\/schema\/person\/c318ac91032ff641c8e428b21a068745"},"headline":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda","datePublished":"2026-07-03T01:31:18+00:00","mainEntityOfPage":{"@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/"},"wordCount":408,"commentCount":0,"image":{"@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#primaryimage"},"thumbnailUrl":"https:\/\/zerohorabrasil.com\/wp-content\/uploads\/2026\/07\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg","articleSection":["Economia e Neg\u00f3cios"],"inLanguage":"pt-BR","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/","url":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/","name":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda -","isPartOf":{"@id":"https:\/\/zerohorabrasil.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#primaryimage"},"image":{"@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#primaryimage"},"thumbnailUrl":"https:\/\/zerohorabrasil.com\/wp-content\/uploads\/2026\/07\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg","datePublished":"2026-07-03T01:31:18+00:00","author":{"@id":"https:\/\/zerohorabrasil.com\/#\/schema\/person\/c318ac91032ff641c8e428b21a068745"},"breadcrumb":{"@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#breadcrumb"},"inLanguage":"pt-BR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/"]}]},{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#primaryimage","url":"https:\/\/zerohorabrasil.com\/wp-content\/uploads\/2026\/07\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg","contentUrl":"https:\/\/zerohorabrasil.com\/wp-content\/uploads\/2026\/07\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg","width":1600,"height":800,"caption":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda"},{"@type":"BreadcrumbList","@id":"https:\/\/zerohorabrasil.com\/ultimas-noticias\/ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"In\u00edcio","item":"https:\/\/zerohorabrasil.com\/"},{"@type":"ListItem","position":2,"name":"Ferrovia Transnordestina, entre CE e PI, atinge 82% de obra conclu\u00edda"}]},{"@type":"WebSite","@id":"https:\/\/zerohorabrasil.com\/#website","url":"https:\/\/zerohorabrasil.com\/","name":"","description":"Zh Brasil","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/zerohorabrasil.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"pt-BR"},{"@type":"Person","@id":"https:\/\/zerohorabrasil.com\/#\/schema\/person\/c318ac91032ff641c8e428b21a068745","name":"Pedro Rafael Vilela - Reporter da Agencia Brasil","image":{"@type":"ImageObject","inLanguage":"pt-BR","@id":"https:\/\/secure.gravatar.com\/avatar\/45d311b6c169fdb85f7677d430aba5f5d4d94cec71b6ab993c45397f1be11d65?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/45d311b6c169fdb85f7677d430aba5f5d4d94cec71b6ab993c45397f1be11d65?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/45d311b6c169fdb85f7677d430aba5f5d4d94cec71b6ab993c45397f1be11d65?s=96&d=mm&r=g","caption":"Pedro Rafael Vilela - Reporter da Agencia Brasil"},"url":"https:\/\/zerohorabrasil.com\/author\/pedro-rafael-vilela-reporter-da-agencia-brasil\/"}]}},"jetpack_sharing_enabled":true,"jetpack-related-posts":[{"id":25471,"url":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos\/","url_meta":{"origin":27030,"position":0},"title":"Transnordestina j\u00e1 tem mais de 100 quil\u00f4metros de malha conclu\u00eddos","author":"Agencia Brasil","date":"12 de junho de 2026","format":false,"excerpt":"A Ferrovia Transnordestina alcan\u00e7ou um recorde em sua constru\u00e7\u00e3o ao registrar o maior ritmo di\u00e1rio de montagem desde o in\u00edcio das obras, no \u00faltimo domingo (7). Na ocasi\u00e3o, as equipes conclu\u00edram 1,69 quil\u00f4metro de ferrovia em um \u00fanico dia, durante a instala\u00e7\u00e3o de 3,36 quil\u00f4metros de trilhos no Lote 5,\u2026","rel":"","context":"Em &quot;Economia e Neg\u00f3cios&quot;","block_context":{"text":"Economia e Neg\u00f3cios","link":"https:\/\/zerohorabrasil.com\/informacoes\/economia-e-negocios\/"},"img":{"alt_text":"transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos","src":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25471-transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos.jpeg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25471-transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos.jpeg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25471-transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos.jpeg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25471-transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos.jpeg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25471-transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos.jpeg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25471-transnordestina-ja-tem-mais-de-100-quilometros-de-malha-concluidos.jpeg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":7159,"url":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina\/","url_meta":{"origin":27030,"position":1},"title":"Governo destina mais R$ 1,4 bilh\u00e3o para obras da Transnordestina","author":"","date":"19 de julho de 2025","format":false,"excerpt":"O presidente Luiz In\u00e1cio Lula da Silva anunciou, nesta sexta-feira (18), R$ 1,4 bilh\u00e3o em novos recursos para as obras da Ferrovia Transnordestina. Lula visitou um dos trechos j\u00e1 finalizados do empreendimento, no munic\u00edpio de Miss\u00e3o Velha, no Cear\u00e1, e disse que n\u00e3o faltar\u00e3o recursos para as obras.Lula destacou a\u2026","rel":"","context":"Em &quot;Economia e Neg\u00f3cios&quot;","block_context":{"text":"Economia e Neg\u00f3cios","link":"https:\/\/zerohorabrasil.com\/informacoes\/economia-e-negocios\/"},"img":{"alt_text":"governo-destina-mais-r$-1,4-bilhao-para-obras-da-transnordestina","src":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/07\/7159-governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/07\/7159-governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/07\/7159-governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/07\/7159-governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/07\/7159-governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/07\/7159-governo-destina-mais-r-14-bilhao-para-obras-da-transnordestina.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":25481,"url":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu\/","url_meta":{"origin":27030,"position":2},"title":"Governo vai defender retomada de obras da Transnordestina junto ao TCU","author":"Luciano Nascimento - Reporter da Agencia Brasil","date":"12 de junho de 2026","format":false,"excerpt":"O vice-presidente Geraldo Alckmin disse nesta sexta-feira\u00a0(12) que vai defender,\u00a0junto ao Tribunal de Contas da Uni\u00e3o (TCU), a retomada das obras da ferrovia Transnordestina no trecho\u00a0entre Salgueiro e o Porto de Suape.\u00a0O percurso fica entre os munic\u00edpios pernambucanos de Ipojuca e Cabo de Santo Agostinho, na Regi\u00e3o Metropolitana do Recife.Em\u2026","rel":"","context":"Em &quot;Economia e Neg\u00f3cios&quot;","block_context":{"text":"Economia e Neg\u00f3cios","link":"https:\/\/zerohorabrasil.com\/informacoes\/economia-e-negocios\/"},"img":{"alt_text":"governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu","src":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25481-governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25481-governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25481-governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25481-governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25481-governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25481-governo-vai-defender-retomada-de-obras-da-transnordestina-junto-ao-tcu.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":25447,"url":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu\/","url_meta":{"origin":27030,"position":3},"title":"Governo vai defender retomada de obras da Transordestina junto ao TCU","author":"Luciano Nascimento - Reporter da Agencia Brasil","date":"12 de junho de 2026","format":false,"excerpt":"O vice-presidente Geraldo Alckmin disse nesta sexta-feira\u00a0(12) que vai defender,\u00a0junto ao Tribunal de Contas da Uni\u00e3o (TCU), a retomada das obras da ferrovia Transnordestina no trecho\u00a0entre Salgueiro e o Porto de Suape.\u00a0O percurso fica entre os munic\u00edpios pernambucanos de Ipojuca e Cabo de Santo Agostinho, na Regi\u00e3o Metropolitana do Recife.Em\u2026","rel":"","context":"Em &quot;Economia e Neg\u00f3cios&quot;","block_context":{"text":"Economia e Neg\u00f3cios","link":"https:\/\/zerohorabrasil.com\/informacoes\/economia-e-negocios\/"},"img":{"alt_text":"governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu","src":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25447-governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25447-governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25447-governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25447-governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25447-governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2026\/06\/25447-governo-vai-defender-retomada-de-obras-da-transordestina-junto-ao-tcu.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":3115,"url":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/salario-na-construcao-recua-22-em-dez-anos-diz-ibge\/","url_meta":{"origin":27030,"position":4},"title":"Sal\u00e1rio na constru\u00e7\u00e3o recua 22% em dez anos, diz IBGE","author":"","date":"22 de maio de 2025","format":false,"excerpt":"A m\u00e9dia dos rendimentos dos trabalhadores da constru\u00e7\u00e3o civil, medida em sal\u00e1rios m\u00ednimos, recuou 22% em uma d\u00e9cada.\u00a0Segundo dados da Pesquisa Anual da Ind\u00fastria da Constru\u00e7\u00e3o (Paic), divulgada nesta quinta-feira (22), pelo Instituto Brasileiro de Geografia e Estat\u00edstica (IBGE), a m\u00e9dia salarial caiu de 2,7 sal\u00e1rios m\u00ednimos em 2014 para\u2026","rel":"","context":"Em &quot;Economia e Neg\u00f3cios&quot;","block_context":{"text":"Economia e Neg\u00f3cios","link":"https:\/\/zerohorabrasil.com\/informacoes\/economia-e-negocios\/"},"img":{"alt_text":"salario-na-construcao-recua-22%-em-dez-anos,-diz-ibge","src":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3115-salario-na-construcao-recua-22-em-dez-anos-diz-ibge.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3115-salario-na-construcao-recua-22-em-dez-anos-diz-ibge.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3115-salario-na-construcao-recua-22-em-dez-anos-diz-ibge.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3115-salario-na-construcao-recua-22-em-dez-anos-diz-ibge.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3115-salario-na-construcao-recua-22-em-dez-anos-diz-ibge.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3115-salario-na-construcao-recua-22-em-dez-anos-diz-ibge.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]},{"id":3131,"url":"https:\/\/zerohorabrasil.com\/economia-e-negocios\/ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014\/","url_meta":{"origin":27030,"position":5},"title":"IBGE: sal\u00e1rio na constru\u00e7\u00e3o recua 22% em 2023, na compara\u00e7\u00e3o com 2014","author":"","date":"22 de maio de 2025","format":false,"excerpt":"A m\u00e9dia dos rendimentos dos trabalhadores da constru\u00e7\u00e3o civil, medida em sal\u00e1rios m\u00ednimos, recuou 22% em uma d\u00e9cada.\u00a0Segundo dados da Pesquisa Anual da Ind\u00fastria da Constru\u00e7\u00e3o (Paic), divulgada nesta quinta-feira (22), pelo Instituto Brasileiro de Geografia e Estat\u00edstica (IBGE), a m\u00e9dia salarial caiu de 2,7 sal\u00e1rios m\u00ednimos em 2014 para\u2026","rel":"","context":"Em &quot;Economia e Neg\u00f3cios&quot;","block_context":{"text":"Economia e Neg\u00f3cios","link":"https:\/\/zerohorabrasil.com\/informacoes\/economia-e-negocios\/"},"img":{"alt_text":"ibge:-salario-na-construcao-recua-22%-em-2023,-na-comparacao-com-2014","src":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3131-ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014.jpg?resize=350%2C200&ssl=1","width":350,"height":200,"srcset":"https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3131-ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014.jpg?resize=350%2C200&ssl=1 1x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3131-ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014.jpg?resize=525%2C300&ssl=1 1.5x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3131-ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014.jpg?resize=700%2C400&ssl=1 2x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3131-ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014.jpg?resize=1050%2C600&ssl=1 3x, https:\/\/i0.wp.com\/zerohorabrasil.com\/wp-content\/uploads\/2025\/05\/3131-ibge-salario-na-construcao-recua-22-em-2023-na-comparacao-com-2014.jpg?resize=1400%2C800&ssl=1 4x"},"classes":[]}],"jetpack_featured_media_url":"https:\/\/zerohorabrasil.com\/wp-content\/uploads\/2026\/07\/27030-ferrovia-transnordestina-entre-ce-e-pi-atinge-82-de-obra-concluida.jpg","_links":{"self":[{"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/posts\/27030","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/users\/326"}],"replies":[{"embeddable":true,"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/comments?post=27030"}],"version-history":[{"count":0,"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/posts\/27030\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/media\/27031"}],"wp:attachment":[{"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/media?parent=27030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/categories?post=27030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/zerohorabrasil.com\/wp-json\/wp\/v2\/tags?post=27030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}